As the BBS Design Build project at Sysco’s new facility on Stevenage Dr. starts to wrap up, here are some photo updates of the project. The new 40,000 ft2 2 -storey Office Building A look at the new 100,000 ft2 Freezer addition with new loading docks from the snowy beginnings when steel was up.